Customization: | Available |
---|---|
Type: | Extrusion Blow Molding Machine |
Raw Material: | HDPE |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Machine Model
|
Max. Bottle size
|
Production forecast
|
|
ABLB75
|
Single Station Single Head
|
5L
|
140~160 BPH
|
u Product: 0~5 L Bottles
u Power supply: 380/220v 50/60 Hz Tri-phase
u Die head number: Single / Double
u Suitable raw material: PE, PP, PVC, PS, PETG
u Output capacity: 220~240 pcs/h (5L) / with single head
450~480 pcs/h (1L) / with double head
Basic parameters | Suitable material | PE.PP,PVC,PS,PETG,so on | ||
Max volume | 5L (Single head) / 50-80mm plastic ball | |||
Output capacity | 220~240 pcs bottles / 2700-3000 pcs balls per hour | |||
Size | 3.8×2.3×2.5(M) | |||
Weight | 4.8T | |||
system | Specification | Parameters | Note | |
Plasticizion system | ||||
Summarize | High efficient low power consumption plasticizion system,transducer control,self-protect function when started at low temperature | |||
Reducer | Material of Gear box body: HT200 Material of gear: ZG35CrMo Material of bearing: 42CrMo Heat treatment of Gear: Quenching |
Brand: GuoTai (The best Gearbox supplier in China) |
||
Screw | ∮75mm,L/D ratio 25/1, Material: 38CrMoALA Nitriding heat-treatment Cooling by cooling Fan |
Cooling system available | ||
Plasticization | 100Kg/H | HDPE | ||
Heating Zone | 3-4 Aluminum Heater | Automatic heating | ||
Heating power | 4KW/H | |||
Extrusion Motor | Three phase asynchronous motor (380V,50HZ) 30HP | Brand: Siemens | ||
Cooling Fan | 3-4zone | Automatic cooling | ||
Extrusion system |
||||
Summarize | High-grade alloy steel, center feeding Avaible to change to double die head or thriple die heads |
|||
Die head number | Single head for 5L / double head for 1L | |||
Center distance of die heads | 130mm or 160mm for Double die head 75mm or 80mm for Four die head |
|||
Die head | Material of the die Head:38CrMoAlA+40Cr+45# Steel Die head corn mirror degree |
We provide complete set die for each sample free | ||
Heating | 3-4 Stainless steel heating cycle With Plug type heater High quality thermocouple for temperature checking |
Plug type heater more easy and convinient for changing die heads | ||
Heating power | 3~5KW | |||
Clamping system | Automatic Lubricant system for clamping system | |||
Clamping force | 80KN | |||
Template distance | 150~560mm | |||
Max mould size | 400X450mm | |||
Platen moving stroke | 520mm | |||
Lubrication | Equiped with automatic lubrication system | |||
Electric system |
Summarize | PLC+ touch screen(man-machine interface)standard extrusion blow molding machine controlling system(AUTO monitoring, fault-alarm, auto counting ,auxiliary function available) | SIEMENS or MITSUBISHI PLC System + TOUCH SCREEN |
|
Operate interface | Touch screen, automatic self-diagnose alarm system | |||
Temperature control | Automatic temperature control module | SIEMENS OR MITSUBISHI MODULE | ||
Electrical parts | Schneider electricals & Omron relay | |||
Electric protection | Ampere overload, electric short circuit self-protection function | |||
Parison controller | JAPAN MOOG 100 points parison controller + Moog servo Valve + stainless oil tank + oil pipes & fittings (Optional : 10500 USD/ complete set if needed ) |
|||
Invertor | DELTA (TAIWAN) 380V50HZ One for main screw + another for lever line screw |
|||
Hydraulic system | Summarize | Multiple function hydraulic integrated block Proportional control, high efficient | ||
Oil pump motor | Three phase asynchronous motor (380V,50HZ) 7.5kw | |||
Oil pump | Imported double pump | |||
Valves | JAPAN YUKEN Hydraulic valves | |||
YUKEN Hydrulic valve Precision control More safe and easy to operate and maintenance Also YUKEN series avoid any leakage problem both inner or outter, which makes the all operation reliable and safe. |
||||
O-sealings | High quality O-sealings |
We provide spare parts for each sealings | ||
Oil pipes | Double layer overpressure resistant | |||
System pressure | LP 100 bar / HP 130 bar Threads of hydraulic block use of screw joint GE(ISO 1179) |
|||
Cooling system | Separate water cooling cycle, oil cooler cooling system High quality Oil cooler |
|||
Pneumatic system | Summarize | Taiwan AIRTAC pneumatic system | ||
Air pressure | 0.8Mpa | |||
Air displacement | 0.8M3/min | |||
Electromagnetic valve | AIRTAC | |||
Cooling system | Summarize | Separate cooling system of mould, barrel and oil system | ||
Cooling medium | Water | |||
Water flow | 80L/min | |||
Water pressure | 0.3-0.6MPa |
High Quality Blow Molding mould
In the process of plastic blow molding, the mold is a very important part. A good blow mould can make the product production more smoothly, and a good blowing mold can also make the finished product more flexible and beautiful.
DAWSON will be your reliable friend in China, and we will always do our best to give you max support!
FAQ
|
Q: Can we visit your factory? Sure. We located in Zhangjiagang city which is very near Shanghai. For overseas customers, you can fly to Shanghai Pudong International Airport. We can pick you up in the Airport. (or Hongqiao International Airport. ) We also provide visit online by video. Q: How can we get the exact price of plastic machine? Contact us with the products size, shape, annual quantity and photo if possible. We can recommend our machine models with quotation. Q: Do you provide any spare parts with machine? Yes, we offer all necessary spare parts before shipment.(contact us for packing list ) Q: How about your after-sale service ? We offer manual instruction and engineer training before loading,after shipment we provide 24 HRS online support, video technical support or field installation assist. Q: What is the lead time? For customized machine, it takes about 45-50 days after deposit. For stock machine, fast shipment. ( The actual production cycle will vary according to the degree of customization.) Q: What is the warranty period for your machine ? 12 months warranty for components and technical support . Q: Do you provide custom machines? Most of our machines are customized. Our goal is efficiency and stable performance. We design the machines according to customers products to meet customer' needs. Q: How can we install the machine when it arrives? We can send experienced technicians to customer's country for guiding the installation and commission the machine, also train the customer's employees. Q: What's DAWSON's advantage? DAWSON provide customers with turnkey projects. Including plant design, plastic machine and mold installation, debugging, also we can source the auxiliary equipments for customers. We can ship the full set of machines after testing in our factory. It will save a lot of cost and time. DAWSON will be your reliable friend in China, and we will always do our best to give you max support! |